Suzuki Grand Vitara SQ416/SQ420/420WD

since 1998 of release

Repair and car operation



Suzuki Grandee of Wetar
+ General information
+ Maintenance and greasing
+ Heater, ventilation and conditioner
+ Steering
+ Suspension bracket
+ Wheels and tires
+ Forward driving shaft/bearing of a shaft. Oil epiploon
+ Driveshafts
+ Brake system
+ Engines
+ Fuel system
+ ignition System
- Start system
   + General description
   - Diagnostics
      Block repair
      Analysis
      Assembly
      Survey
      Work check
      Specifications
      Type of 0.9 kV
   Necessary materials
   Special tool
+ release System
+ Transmissions
+ Coupling
+ Transfer
+ Forward and back differentials
+ Windows, mirrors, locks and security measures. Immobilizer
+ Electric equipment


5917e1e5



Assembly

  • It is not authorized to wash out, regulate or assort the shock-absorber (a disk of the coupling of coupling).
  • New bearings without greasing were greased, when were delivered as spare parts. Do not wash out a maslorastvoritel and do not grease with other lubricant substance.

 PERFORMANCE ORDER

  1. Check components (see. Survey) also replace on new if necessary.
  2. Put greasing (see. Starter).
  3. Establish an anchor on a collar.
  4. Establish brushes and springs of brushes on a shchetkoderzhatel.
  5. Establish a shchetkoderzhatel on an anchor, squeezing out 4 brushes outside.
1 — a brush
2 — a brush spring
3 — a shchetkoderzhatel
  1. Establish a back sleeve and then a cap of a back bracket.
  2. Establish a back bracket.
  3. Tighten screws of a shchetkoderzhatel.
1 — a back bracket
2 — screws of a shchetkoderzhatel
  1. Establish assembly of the obgonny coupling on a shaft - a gear wheel, paying attention to the direction of installation of a lock ring of a gear.
1 — the obgonny coupling
2 — a lock ring of a gear
3 — a persistent ring
4 — a shaft gear wheel
  1. Insert shaft assembly into a forward casing, position of the lever.
1 — lever assembly
2 — the lever
  1. Establish laying so that cuts in it were combined with openings for through bolts in a forward casing.
  2. Establish a plate and rubber consolidation in a forward casing.
1 — laying
2 — planetary transfer
3 — an opening for a bolt
4 — rubber consolidation
  1. Put greasing on a ball and establish a ball in a shaft opening.
1 — a ball
  1. Establish a collar, an anchor, a shchetkoderzhatel and a back bracket in a forward casing, having combined the marks put before removal.
  2. Tighten through bolts.
1 — bolts
2 — reducer assembly
  1. Establish assembly of the electromagnetic switch and a protector (if is). Connect a wire (to the motor) to a switch conclusion.
  2. After the completion of assembly inspect work.
1 — the electromagnetic switch
2 — a protector